HPE6-A66 Exam Dumps Pass with Updated Nov-2021 Tests Dumps [Q27-Q42]

Share

HPE6-A66 Exam Dumps Pass with Updated Nov-2021 Tests Dumps

HPE6-A66 exam questions for practice in 2021 Updated 60 Questions

NEW QUESTION 27
A company has two buildings on a campus, where each building has three floors, which two wiring closets per floor Assume that there will be 24 APs connected via POE+ to each wiring closet, along with 128 wired user connections. Which backplane stacking solution will provide the necessary Ethernet port capacity for all devices on Building 1 Floor 2 and is fully meshed?

  • A. Two 2930F 24-port POE+ switches and three 2930F 48-port switches per wiring closet
  • B. One 381 OM 24-port POE+ switches and two 2930M 48-port switches per wiring closet
  • C. One 2930M 24-port POE+ switch and two 2930M 48-port switches per wiring closet
  • D. Two 381 OM 24-port POE+ switches and three 381OM 48-port switches per wiring closet

Answer: C

 

NEW QUESTION 28
A customer requires a campus core virtualization solution that supports a dual control and management planes, as well as active-active forwarding paths. Which solution would meet the customer's requirements?

  • A. VSX
  • B. Mesh stacking
  • C. Backplane stacking
  • D. VSF

Answer: C

 

NEW QUESTION 29
Which IRIS option will automatically create a project with a blank preconfigured Site-1 ?

  • A. New Campus
  • B. New Express Mode
  • C. New Site
  • D. New Project

Answer: A

 

NEW QUESTION 30
A company needs an upgrade of its access layer switches. The solution requires that devices connected to the access layer by authenticated and their traffic processed by the firewall features of the Aruba Mobility Controllers. Which solution should the company implement?

  • A. GRE tunneling
  • B. PAPI mobility
  • C. Dynamic segmentation
  • D. iPsec tunneling

Answer: D

 

NEW QUESTION 31
A high-end theater venue will be implementing an Aruba wireless solution using ceiling- and wall-mounted APs. The venue wants to ensure the the APs blend into the ceiling and wall environments. What solution should the customer use to ensure that wireless coverage is not hampered?

  • A. Order Aruba AP covers for the APs
  • B. Paint the APs to match the ceilings or walls
  • C. Place the APs above the ceiling and behind the walls
  • D. Place a strip of tape over the LEDs

Answer: C

 

NEW QUESTION 32
A wiring closet with a POE+ switch is 250 feet (76 meters) away from an AP on a building floor. The AP's smart-rate port is connected to a smart-rate port on the switch, which is capable of 10 Gbps. The cable type is Cat5e STP. What is the maximum speed that the customer can expect from the connected AP?

  • A. 10 Gbps
  • B. 5 Gbps
  • C. 1 Gbps
  • D. 2.5 Gbps

Answer: D

 

NEW QUESTION 33
A network architect is designing a new wireless solution for a company The company needs seamless roaming and client and AP active load balancing. The company also requires an Aruba Mobility Master (MM) to manage the wireless infrastructure. Which Aruba feature does the architect need to include in the design?

  • A. IAP VC
  • B. Client Match
  • C. Clustering
  • D. AirMatch

Answer: C

 

NEW QUESTION 34
A customer has over 100 access layer switches. The customer requires user authentication done via the Aruba Dynamic Segmentation feature. What components are required to implement this solution? (Select two.)

  • A. AirWave server
  • B. enterpnse authentication server
  • C. Active Directory server
  • D. Aruba APs
  • E. Aruba mobility controller

Answer: A,E

 

NEW QUESTION 35
A customer is purchasing Aruba 555 APs for a new wireless network. The APs will be pre-staged as campus APs (CAPs) and be managed by a controller solution During the pre-staging process, console access to the APs might be necessary Which console connection cable should the customer purchase for the 555 APs?

  • A. RS-232
  • B. RJ-45
  • C. USB-A
  • D. Micro-B USB

Answer: D

 

NEW QUESTION 36
A company has hired a network architect to replace an existing legacy wireless and wired network The building is one-story and contains four wiring closets Based on the information the network architect gathered from the company, one 48-port POE+ switch and three 48-port non-POE+ switches will be placed in each wiring closet. One stacking domain should be created for each wiring closet that supports 40 Gbps uplinks.
Which stacking solution should the architect implement for the floor that meets the requirements and is the most cost-effective'?

  • A. Backplane stacking
  • B. Distributed trunking
  • C. VSX
  • D. VSF

Answer: C

 

NEW QUESTION 37
Refer to the exhibit.

When planning the use of Cat7 cabling for a SmartRate connection between an ArubaOS AP and an ArubaOS switch, which sections should be considered when calculating distance?

  • A. A + C
  • B. A + B + C
  • C. A + B + C + D
  • D. A + B

Answer: C

 

NEW QUESTION 38
A network architect needs to plan a new wireless network

  • A. Airwave, Central, and Windows only
  • B. Airwave and Central only
  • C. Airwave, Central, Windows, Mac OSX, and Linux
  • D. Central only

Answer: B

 

NEW QUESTION 39
A network designer is documenting the number of physical sites for a customer that is within the scope of a redesign project. When determining the network purpose at each site, on what should the designer focus at each site? (Select two.)

  • A. number of users
  • B. square footage
  • C. number of buildings
  • D. ceiling height
  • E. types of users and their devices

Answer: B,D

 

NEW QUESTION 40
A company needs to replace an existing legacy wireless and wired solution with one that supports features like 802 11 ax for APs and logical switching for switches. The company is located on a single floor with two wiring closets. Assume that there will be 10 APs connected via POE+ to each wiring closet, along with 36 wired user connections All switches on a floor should be configured in a single stack. The distance between wiring closets is 100 feet (31 meters).
Which switching solution will minimally provide 10 Gbps uplinks at the most cost-effective price, while still meeting the company's requirements?

  • A. 2930F switches
  • B. 5406R switches
  • C. 2930M switches
  • D. 3810M switches

Answer: C

 

NEW QUESTION 41
A network architect is creating a new wired design for a warehouse building. As a best practice, what length should the architect allow for the service loop in the wiring closets in this environment?

  • A. 3-10 feet (1-3 m)
  • B. 15-30 feet (5-10 m)
  • C. 30-60 feet (10-20 m)
  • D. 3 feet (1 m)

Answer: D

 

NEW QUESTION 42
......

Authentic HPE6-A66 Dumps With 100% Passing Rate Practice Tests Dumps: https://www.torrentvce.com/HPE6-A66-valid-vce-collection.html

Updated Premium HPE6-A66 Exam Engine pdf: https://drive.google.com/open?id=1xsiEpd6baOkPSFgjHsOPGn8fFm-acJup