Get 2021 Updated Free SAP C-TSCM42-67 Exam Questions & Answer [Q50-Q66]

Share

Get 2021 Updated Free SAP C-TSCM42-67 Exam Questions & Answer

C-TSCM42-67 Dumps PDF and Test Engine Exam Questions


SAP C-TSCM42-67 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Basics on SAP Business Processes (E-Learnings) < 8%

Outline the scope of SAP SCM business processes.

Application Overview and Background < 8%

Characterize the interplay of master data, planning, ATP, and production functionality.

Process Orders (PP-PI) < 8%

Identify specific properties of process orders.

Production Orders Basics (PP-SFC) 8% - 12%

Apply production order functionality.

Master Data (LDM) 8% - 12%

Set up master data for production planning and manufacturing.

Material and Capacity Requirements Planning > 12%

Characterize production-relevant planning functionality.


 

NEW QUESTION 50
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

  • A. Rate routing
  • B. Control cycle
  • C. Product cost collector
  • D. Production supply area
  • E. Production version

Answer: B,D

 

NEW QUESTION 51
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)

  • A. Standard values in the operations of routings
  • B. General item values of bill of materials
  • C. User-defined fields in the operation of routings
  • D. General operation values of routings
  • E. General values from work scheduling view of the material master

Answer: A,C,D

 

NEW QUESTION 52
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?

  • A. 6.16 hours
  • B. 8 hours
  • C. 7 hours
  • D. 5.6 hours

Answer: D

 

NEW QUESTION 53
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)

  • A. Posting the goods receipt for the production order
  • B. Rescheduling the operation
  • C. Reducing the order quantity
  • D. Confirming the operation
  • E. Setting the status technically complete (TECO)

Answer: C,D,E

 

NEW QUESTION 54
Which of the following statements about consumption are correct? (Choose two)

  • A. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
  • B. Consumption is restructured with the planning run.
  • C. Consumption takes place on the material level between the planned independent requirements and the planned orders.
  • D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Answer: A,D

 

NEW QUESTION 55
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

  • A. Operation control key (routing)
  • B. Standard values (routing)
  • C. Transport time (routing)
  • D. Formulas (work center)
  • E. In-house production time (material master)

Answer: A,B,D

 

NEW QUESTION 56
Which property applies for consumption with planning strategy 40 (planning with final assembly)?

  • A. Consumption can result in subsequent adjustments of planned receipts.
  • B. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
  • C. Consumption takes place with the planning material.
  • D. Consumption can reduce the originally planned production quantity.

Answer: A

 

NEW QUESTION 57
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)

  • A. The planning of MPS and non-MPS items is always carried out in one planning run.
  • B. Non-MPS items can be taken into consideration by an MPS run.
  • C. MPS items are planned in a standard MRP run.
  • D. MPS items can be defined on MRP area level.
  • E. MPS items can be defined on plant level.

Answer: B,D,E

 

NEW QUESTION 58
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)

  • A. Variable calculation of material quantities (product output, material usage).
  • B. Manufacturing in charge quantities.
  • C. Manufacturing without orders.
  • D. Master recipe-based manufacturing.
  • E. Material requirements planning for production resources.

Answer: A,B,D

 

NEW QUESTION 59
Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?

  • A. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.
  • B. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.
  • C. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.
  • D. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.

Answer: B

 

NEW QUESTION 60
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)

  • A. Resource selection
  • B. Batch record
  • C. Availability check
  • D. Material identification and reconciliation
  • E. Digital signature

Answer: B,D,E

 

NEW QUESTION 61
Which of the following elements can be used in a process order? (Choose three)

  • A. Process instructions
  • B. Parallel sequences
  • C. Suboperations
  • D. Relationships
  • E. Phases

Answer: A,D,E

 

NEW QUESTION 62
Where in the SAP ECC system can you define production versions?

  • A. In the routing
  • B. In the material master
  • C. In the work center
  • D. In the bill of material

Answer: B

 

NEW QUESTION 63
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?

  • A. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
  • B. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
  • C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
  • D. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.

Answer: A

 

NEW QUESTION 64
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)

  • A. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
  • B. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
  • C. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
  • D. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.

Answer: C,D

 

NEW QUESTION 65
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

  • A. Bill of material
  • B. Material master
  • C. Work center
  • D. Production version
  • E. Task list

Answer: A,B,E

 

NEW QUESTION 66
......