
[Oct-2026] Get 100% Real Free API Certification API-1169 Sample Questions
Accurate API-1169 Questions with Free and Fast Updates
NEW QUESTION # 257
Work Permits for Confined Space Entry would be found under which OSHA standard?
- A. OSHA 1910.119 (k) (29 CFR 1910) occupational safety and health standard
- B. Within a set of written process safety information controls(29 CFR 1910.119, general knowledge)
- C. OSHA 1910.146 (29 CFR 1910) occupational safety and health standard
- D. A spike test, strength test and/or a leak test(API 1110, 4.1.3 a)
Answer: A
NEW QUESTION # 258
Combustible liquids have a flash point above ________ deg F.
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION # 259
Perform these before any mechanical ground disturbance
- A. Identifying, documenting and oversee activity
- B. Pressure testing
- C. Impressed current
- D. Sweep locate, pot hole, one call
Answer: D
NEW QUESTION # 260
Permanent trench breakers cannot be installed within a ______________
- A. Casing
- B. Greenfield
- C. Swamp-land
- D. Wetland
Answer: C
NEW QUESTION # 261
Color used for surveyed electrical lines
- A. Yellow
- B. White
- C. Green
- D. Red
Answer: D
NEW QUESTION # 262
INGAA
- A. Interstate Natural Gas Association of America
- B. Regulation Transportation of Hazardous Liquids by Pipeline
- C. Pipeline Hazardous Materials and Safety Administration
- D. Communication, Alarm or Signal Lines
Answer: C
NEW QUESTION # 263
Define preventative action in terms related to action.
- A. An individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and Industry practises are being met safely, effectively, and in an environmentally sound manner.
- B. Is the entity that owns our operates the existing pipeline facilities. The owner may designate a third-party or parties to perform the tasks necessary to enable a safe crossing of its facilities by crossing company but remains responsible for the work performed by such third-party.
- C. Inspectors are expected to function at all times as a representative of the pipeline company owning and or managing the project. In most cases the inspector works for or represents a pipeline company, with strict procedures and war contract provisions are in place that spell out the expectations and obligations of the inspectors performance.
- D. Action to illuminate the cause of a potential nonconformity or other potential undesirable situation.(Preventative action is taken to prevent occurrence were as correct of action is taken to prevent recurrence)(ISO 9000 3.12.1)
Answer: A
NEW QUESTION # 264
All compressed gas cylinders and tanks should be properly _______________ and ______________ when transported and stored.
- A. Grading
- B. Secured and labeled
- C. Permits and precautions
- D. Effectiveness
Answer: B
NEW QUESTION # 265
When a ditch for a pipeline is filled, it must be done so that it provides what for the pipeline?
- A. Verify that the limits of authorized construction work areas and access roads are abided by
- B. it provides proper support for the pipe and prevents damage to the pipe and its coating
- C. Site Specific test procedure
- D. A vertical line in the back of the ears
Answer: D
NEW QUESTION # 266
Submerged soil from which water is freely seeping
- A. fract-out
- B. C
- C. A
- D. Tag or documents certifying it has been inspected
Answer: B
NEW QUESTION # 267
Inspectors should be familiar with environmental requirements for crossings of waterway crossings, water bodies, and wetlands including:
-Knowing who is responsible for mitigation of intrusion
-Who determines where the crossing is to take place
-Where the closest pedestrian and vehicle bridges are impacted
-Understanding of permit documentation requirements.
- A. Site specific test procedure
- B. Understanding of permit documentation requirements
- C. The transmission line must be protected.Subpart G 192.325
- D. Design of slope breakers
Answer: B
NEW QUESTION # 268
A quality management system/policy for all products and servicing shall measure the ___________ and improve upon the system.
- A. efficiency
- B. effectiveness
- C. quality control
- D. productivity
Answer: B
NEW QUESTION # 269
Crossing angle
- A. Gouges, buckles, wrinkles, ripples or ovality,s
- B. Grading
- C. As close to perpendicular as possible
- D. Grubbing (not allowed in wet lands)
Answer: C
NEW QUESTION # 270
During the welding or after the world has been completed, but before visual or non-destructive testing is carried out, the grinding or removal of an imperfection is referred to as?
- A. Rework (api 1099 3.1.25)
- B. Spike test(api 1110 4.1.7.2)
- C. 50% (api 1104 7.3)
- D. Rework(API 1104 3.1.25)
Answer: A
NEW QUESTION # 271
Define SPCC
- A. National pollutant discharge elimination systems
- B. Resource conservative in recovery act
- C. Spill prevention, control, and containment
- D. Operator qualification
Answer: C
NEW QUESTION # 272
Define process in terms related to process.
- A. Part of quality management focussed on setting quality objectives and specifying necessary operational processes, and resources to achieve the quality objectives(ISO 9000 3.3.5)
- B. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)
- C. Hearing protection is used when the work environment noise level exceeds 85 dbA over an 8-hour period
- D. Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities.
Answer: B
NEW QUESTION # 273
The min cover required for buried liquid line in a farmers corn field is ______ inches.
-24
-36
-48
-30
-There is no minimum cover
- A. 100 ft
- B. 0
- C. 1
- D. 2
Answer: C
NEW QUESTION # 274
......
API-1169 Study Guide Realistic Verified Dumps: https://www.torrentvce.com/API-1169-valid-vce-collection.html